SupraLoom

THE COLLEAGUE

Warp.

The loom that learned to think.

Warp is not a chatbot bolted onto your ERP. It is the connective intelligence that runs across every module — quoting, scheduling, inventory, quality — and reasons about your shop the way you do.

Start Free Trial
Warp · SupraLoom

Warp is listening…

1804

In 1804, the Warp loom became the first machine to follow instructions encoded on punch cards. Every computer since is its descendant.

The original Warp didn't just weave cloth. It followed a program. It turned craft into a repeatable, improvable process. It was the first machine that could be taught.

We named our AI colleague for it. The loom that learned to think — now the colleague that runs your shop.

WHAT WARP DOES

Three things Warp does that software never has.

01

Warp quotes.

RFQ in. Send-ready quote out.

Paste a part description or attach a drawing. Warp parses the geometry, builds a BOM estimate, pulls your current material costs, applies your labor rates, and gives you a fully annotated quote with margin call-out — in minutes, not hours.

Warp · SupraLoom

Quote this RFQ for me.

Warp

Parsed the drawing. 4140 steel, 18 operations, estimated 14.2 labor hours. At current rates your cost is $1,340 and target margin puts the quote at $1,875. I flagged one tolerance that'll need a second op on WC-3 — want me to adjust the routing?

Based on item master, labor rates, and last 90 days of similar jobs

02

Warp schedules.

Jobs ranked. Conflicts caught. Commits protected.

Warp watches every work order against real work center capacity, material availability, and operator certifications. When a job slips — or a vendor is late — it flags the downstream impact and offers a reshuffle before you're on the phone with a customer.

Warp · SupraLoom

Why is the schedule red on Thursday?

Warp

WC-3 hits 108% capacity Thursday. The collision is WO-1089 (8 hrs) and WO-1042 (6 hrs) in the same window. Moving WO-1042 to Wednesday afternoon clears it — WO-1042 has 2 days of float.

WC-3 overloaded · 1 reshuffle resolves it

03

Warp learns.

Your shop. Your margins. Your patterns.

Warp builds a model of your shop from the inside out: which customers pay on time, which jobs run over, which vendors under-deliver, which operators finish faster than standard. It gets more useful every week — without you configuring anything.

Warp · SupraLoom

What did we quote Acme last time for part 4471-B?

Warp

Last quote for 4471-B was QT-0741, sent March 3rd. Price: $2,240 for qty 25. They accepted at that price. Your cost at the time was $1,680 — 25% margin. Material costs are up 6% since then.

QT-0741 · March 3, 2026

THE DIFFERENCE

Warp doesn't answer questions.
It runs a shop.

Most “AI features” are a chat window bolted onto existing software. They can tell you what the data says. They cannot act on it, connect it, or reason across modules. Warp is different because it runs natively inside SupraLoom — it sees quoting, scheduling, inventory, and quality as one connected system, not five separate data sources.

Bolted-on AI

Warp

Answers questions

Acts on answers

Reads one data source

Reasons across all modules

You configure the prompts

Warp builds its own context

Chat window only

Embedded in every workflow

Static after training

Learns your shop continuously

PROMPT GALLERY

Six things you can ask Warp today.

From day one of your trial. No training. No configuration.

Warp · SupraLoom

What's my margin on the Acme job?

Warp

The Acme Job #4418 is currently tracking at 24.3% gross — 3.1 points below your target. Labor overrun on the milling step is the driver. Actual time was 6.4 hrs vs. 4.8 standard.

Job #4418 · WC-2 overrun identified

Warp · SupraLoom

Which purchase orders are late?

Warp

Three POs are past due: PO-0892 (RM-208, Acme Metals, 4 days late), PO-0901 (Fasteners, Ridge Supply, 1 day late), PO-0887 (Tooling inserts, Kennametal, 7 days late). PO-0887 is blocking WO-1104.

3 late POs · 1 blocking production

Warp · SupraLoom

Find a drop-in for RM-208.

Warp

RM-208 is 1018 CRS bar, 2" dia. Your AVL has two alternates: Ridge Metals (in stock, lead time 2 days, $0.12/lb more) and Midwest Steel (3 days, $0.08/lb more). Want me to draft a PO to Ridge?

AVL search · 2 qualified alternates found

Warp · SupraLoom

Why is the schedule red on Thursday?

Warp

WC-3 hits 108% capacity Thursday. The collision is WO-1089 (8 hrs) and WO-1042 (6 hrs) scheduled in the same window. Moving WO-1042 to Wednesday afternoon clears it — WO-1042 has 2 days of float.

WC-3 overloaded · 1 reshuffle resolves it

Warp · SupraLoom

What did we quote Acme last time for part 4471-B?

Warp

Last quote for 4471-B was QT-0741, sent March 3rd. Price: $2,240 for qty 25. They accepted at that price. Your cost at the time was $1,680, so 25% margin. Material costs are up 6% since then.

QT-0741 · March 3, 2026

Warp · SupraLoom

Reshuffle the schedule around the Acme due date.

Warp

Done. Moved WO-1042 and WO-1067 forward by one day each. WO-1089 now has clear run at WC-3 Thursday and Friday. The Acme commit is protected. I left WO-1104 in place — it has enough float to absorb.

Schedule updated · Acme commit secured

“I asked Warp why our OTIF dropped last month. It told me in 30 seconds what would have taken my scheduler two hours to piece together. That's the whole point.”

SW

Sarah Whitfield

GM, Forge Works — 87 employees

From 1760 · THE NEXT LOOM

Meet Warp. 14 days. No credit card.

The real thing from minute one — not a preview, not a demo mode.

Start Free TrialSee pricing