◐
Quality.
Receiving always gates inventory. No exceptions.
QC inspection is not optional in SupraLoom. Every receipt triggers an inspection check, every NCR routes to the right person with Warp-assembled context, and every lot hold propagates to downstream work orders automatically.
Start Free TrialWhat's inside
- —Inspection plans per part and per BOM — flagged at WO creation, enforced at receipt
- —QC gate on receiving: inventory quantity never updated before disposition is set
- —NCR creation with Warp-assembled context: supplier history, lot data, similar prior NCRs, risk level
- —Lot hold with one-click propagation — all downstream WOs notified immediately
- —Disposition required before inventory update or vendor credit is initiated
- —First Article Inspection (FAI) workflow for new items and new revisions
- —Customer rejection rate vs. internal NCR rate tracked and surfaced by Warp
Warp on Quality
“When an NCR opens, I pull the supplier's last 12 months of quality history, the lot size, the downstream WO count, and the last three similar defects — and I assemble them into the NCR before you open the form. The context is there before you have to go look for it.”
Meet Warp →